17
01
12
Doin work.
Been in a slump for too long. Time to go back to getting shit done. Plans for this week:
- Change tire for RX-7 #1
- Change all tires on 240z.
- Order 240z parts.
- Find out about the carb trade, possible tune.
- Title transfers for both 7’s.
That’s all I can really think of right now. I need to find a place for a decent paint job and some body work. Really wanna get the entire Z painted before I start installing the interior stuff.
-
willister posted this